Operation of the Z Accelerator in a Long-Pulse Mode
Las Vegas, NV, USA(2001)
关键词
Z pinch,collective accelerators,pulsed power supplies,100 to 120 ns,180 ns,80 ns,Z accelerator operation,charge voltages,circuit-code calculations,current rise-time,isentropic compression,line-1 water switches,long-pulse Z-pinch implosions,long-pulse mode operation,machine shots,nine-line tests,peak amplitudes,peak current,pulse lengths,pulse-forming lines,self-break water switches,water-switch location
AI 理解论文
溯源树
样例

生成溯源树,研究论文发展脉络
Chat Paper
正在生成论文摘要