Commissioning of the Main Coil of the EDIPO Test Facility

Applied Superconductivity, IEEE Transactions  (2014)

引用 18|浏览8
暂无评分
摘要
The EDIPO test facility is erected at CRPP Villigen with the aim of providing a flexible, high field test bed for high current force flow superconductors. The EDIPO main coil is a tilted-head race-track pair wound by a graded Nb3Sn cable-in-conduit conductor. The whole project, partly funded by the European Commission, started in 2004 and entered the commissioning phase in 2013. The final steps of instrumentation and installation of the main coil, delivered by industry in May 2011, lasted about 18 months. The first cool-down of the facility started in November 2012. The commissioning of the main coil, including the precise measurement of the generated magnetic field, was carried out in March 2013. At an operating current of 17.2 kA, a ± 1% homogenous field of 12.35 T was generated over a length of 900 mm in the center of the test well, 140 mm × 91 mm in cross section. Details about cool-down, flux jumps, forces and displacements, field map, and charging rate are presented in this paper.
更多
查看译文
关键词
commissioning,niobium alloys,superconducting coils,tin alloys,edipo main coil,edipo test facility,nb3sn,charging rate,commissioning phase,cool-down,field map,flexible high field test bed,flux jumps,graded cable-in-conduit conductor,high current force flow superconductors,homogenous field,instrumentation,magnetic field measurement,main coil commissioning,main coil installation,operating current,tilted-head race-track pair,${rm nb}_{3}{rm sn}$ cable-in-conduit conductor,high field magnet,test facility,temperature measurement,assembly,conductors
AI 理解论文
溯源树
样例
生成溯源树,研究论文发展脉络
Chat Paper
正在生成论文摘要