A high-temperature superconducting (HTS) power cable demonstration project was started in 2007 to evaluate the cable's performance, stability, and reliability. This project aims to operate a 66-kV 200-MVA HTS cable system in a real power grid of the Tokyo Electric Power Company. A 240-m-long HTS cable was successfully installed, and other system components, such as a cable-to-cable joint, terminations, and a cooling system, were also constructed at the Asahi Substation in Yokohama. After several completion and performance tests on the system, the HTS cable was connected to a real grid from October 29, 2012 to December 25, 2013. The in-grid operation had continued for more than one year without any accidental interruption of the operation or troubles of this system. The temperatures and pressures of liquid nitrogen flowing in the HTS cable were controlled to within the target values. After the in-grid operation, the critical current of the HTS cable was measured, and it was confirmed that there was no degradation compared with the initial results. In addition, no partial discharge was observed in periodical measurements. It is concluded that the HTS cable system has good performance and stability for long-term in-grid operation.
更多
查看译文
关键词
cooling,power grids,superconducting cables,asahi substation,hts cable,tokyo electric power company,yokohama,apparent power 200 mva,cooling system,high-temperature superconducting power cable,size 240 m,superconducting cable system,voltage 66 kv,high-temperature superconductors,superconducting devices,power transmission cable,high temperature superconductors
AI 理解论文
溯源树
样例
生成溯源树,研究论文发展脉络
Chat Paper
正在生成论文摘要