Optimization Study on Maintenance Structure of Shaft in Shield Tunnel
ICPTT 2011: Sustainable Solutions for Water, Sewer, Gas, and Oil Pipelines - Proceedings of the International Conference on Pipelines and Trenchless Technology 2011(2011)
Abstract
There are many factors involved in the maintenance structure of shaft in shield tunnel, and the interaction between various factors is complicated. Combined with starting shaft construction of Xijiang River slurry shield tunnel, this paper analyzed the characteristics and applicability of common foundation maintenance structure, and proposed a composite support consists of diaphragm wall and bolt-shotcrete. A numerical simulation method was used to study the displacement regulation of soil surrounding the maintenance structure and ground settlement features under different excavation footage when using composite support. Construction results show that this composite support effectively ensure the safety of shaft construction.
MoreTranslated text
Key words
ground treatment,receiving,shield tunnel,starting,excavation,optimization,construction safety
AI Read Science
Must-Reading Tree
Example
![](https://originalfileserver.aminer.cn/sys/aminer/pubs/mrt_preview.jpeg)
Generate MRT to find the research sequence of this paper
Chat Paper
Summary is being generated by the instructions you defined