Study of Using Critical Path Method to Formulate the Algorithm of Software Project Schedule Planning
ICIII), 2010 International Conference(2010)
Abstract
Formulating the practical schedule planning for the software project, is the basis of orderly carrying out the software project, is the key of project to success. In this paper, study the application of using the critical path method and related technologies to formulate the computer program algorithm for the software project schedule planning. First of all, to clarify the basis preparations, including determine the project scope, definition activities, activity sequencing, activity duration estimation, etc, Secondly, to derive the critical path, including calculate the active time, determine the critical path, then study the Software algorithm, including database design and use the problem analysis diagram to show the core program algorithm, finally, using the program, which is written in accordance with the algorithm, to simulate project plan instance, and according to the simulate result, for the specific management. The results show that, using the computer software programs to achieve the critical path method and the related techniques to formulate the schedule, to reduce the workload of plan formulation, improve the accuracy of the plan, has the higher theoretical and practical value.
MoreTranslated text
Key words
software project management,critical path method,software development management,software project schedule planning,software algorithm,algorithm,project management,database design,critical path analysis,computer program algorithm,problem analysis diagram,schedule planning,algorithm design and analysis,project planning,databases,schedules,project scheduling,critical path
AI Read Science
Must-Reading Tree
Example
Generate MRT to find the research sequence of this paper
Chat Paper
Summary is being generated by the instructions you defined