Chrome Extension
WeChat Mini Program
Use on ChatGLM

To solve train-set scheduling problem with considering the inspection capacities of multi-depots

Advanced Forum Transportation of China(2009)

Cited 0|Views2
No score
Abstract
The cost of one train-set is very expensive, so how to minimize the amount of train-sets in use is more critical especially under this new round of economic crisis. Consequently, the train-set operation plan has better to program together with its inspection plan, not to be scheduled by different departments. Hence, the inspection capacities of related depots must be considered as programming the train-set operation plan. Under the regulation of China Railway High-speed (CRH) train-set, a new model is presented to solve train-set scheduling problem which considers the inspection capacities of multi-depots. Several schedulings for the Jing-Jin dedicated passenger line are programmed and the results show that train-set scheduling differs greatly from traditional railway operation and more train-sets are needed than the expectation, but by relaxing the inspection limits, the amount of train-sets in use will decrease.
More
Translated text
Key words
economic crisis,scheduling,ant algorithm,inspection capacity,depot,inspection,railway operation,train-set operation plan,passenger line,china railway high-speed train-set,multidepots,railway industry,production planning,train-set scheduling,train-set,inspection plan,industrial economics
AI Read Science
Must-Reading Tree
Example
Generate MRT to find the research sequence of this paper
Chat Paper
Summary is being generated by the instructions you defined