HTR-10备用主氦风机更换方案设计

Hedongli Gongcheng/Nuclear Power Engineering(2008)

Cited 1|Views11
No score
Abstract
采用备用磁轴承主氦风机替代目前使用的滚动轴承主氦风机是10 MW高温气冷堆(HTR-10)的重要技术革新.通过对两风机的比较及一回路舱室剂量场测量验证了操作可行性,提出了舱室内拆装和舱室外拆装两种更换方案,并使用三维数字模拟技术对两种方案进行了仿真.通过对安全性、工作难度、工作量等方面的综合评估,认为舱室外拆装方案可行性较强.
More
Translated text
Key words
10 MW high temperature gas cooling reactor,Replacement scheme,Reserve helium circulator
AI Read Science
Must-Reading Tree
Example
Generate MRT to find the research sequence of this paper
Chat Paper
Summary is being generated by the instructions you defined