棒材进口滚动导卫的改进

Shandong Metallurgy(2009)

Cited 0|Views17
No score
Abstract
针对张钢棒材生产线滚动导卫装置存在的结构复杂、装配困难、不易调整和更换等问题,通过改进滚动导卫的装配结构、固定方式、支撑臂厚度等,使导卫结构简单、紧凑,装配时间由每套40~50min缩短到10min,在线更换时间由30min以上缩短到10min左右,调整、维修便捷,运行稳定性与可靠性得到保证。