Communication of Two PLC Controllers Based on DeviceNet Bus

Coal Mine Machinery(2012)

Cited 23|Views4
No score
Abstract
In a coal mine system on the ground,we often use PLC as the controller of the belt conveyor.It needed two PLC to control the system because the conveyor belt is too long which made it different for wiring.The two belts need to linkage operation because of the work condition,so the two PLC need to communication.We achieve the corporation controlling of the two belts which are controlled by two MicroLogix1500,in this system,we use DeviceNet as the bus.We focus on how to realize the communication of the two PLC.
More
Translated text
Key words
MSG,MicroLogix1500,DeviceNet,controller