Recent improvements and present status of the Munich accelerator facility

Nuclear Instruments and Methods in Physics Research Section A: Accelerators, Spectrometers, Detectors and Associated Equipment(1996)

引用 0|浏览2
暂无评分
摘要
The terminal voltage of the MP-tandem in routine operation has been raised to 15 MV. A new negative ion injector with mass resolutions up to 1:180 has been installed. Commissioning of the superconducting booster TRITRON is in progress, the beam has been injected and gone along 2.6 turns. The TRITRON and most subsystems of the tandem are now under computer control.
更多
查看译文
关键词
munich accelerator facility
AI 理解论文
溯源树
样例
生成溯源树,研究论文发展脉络
Chat Paper
正在生成论文摘要