1000MW超超临界锅炉冲管临时管设计探讨

Electric Power Construction(2011)

Cited 1|Views1
No score
Abstract
介绍华能汕头海门电厂1号1 000MW超超临界机组锅炉冲管临时管的设计;对设计中需要考虑的热应力、补偿性能、热膨胀等因素进行探讨,为同类型燃煤/气机组临冲管的设计提供参考。
More
Translated text
Key words
high-pressure steam purging,boiler flushing pipe,supports and hangers,1000 MW unit,temporary flushing pipe,thermal expansion