Start-Up of the New CPS Controls System and Switch-Over of the 800 MeV Booster Controls

IEEE Transactions on Nuclear Science(1981)

引用 5|浏览13
暂无评分
摘要
The new CPS controls system was successfully put into operation on 19 November, 1980, when the 800 MeV Booster, after switching over to the new system, was started up for particle physics. A subset of the new system had already been installed on the Antiproton Accumulator in Spring 1980 and has reliably served several months of engineering run. The Booster machine and control of the CPS cycle gene...
更多
查看译文
关键词
Control systems,CAMAC,Centralized control,Microprocessors,Particle accelerators,Hardware,Multiplexing,Springs,Reliability engineering,Distributed processing