某深厚透水性地层基坑渗控方案研究

Yangtze River(2010)

Cited 1|Views3
No score
Abstract
南水北调中线一期工程跨河建筑物均安排在枯季以围堰保护形成的基坑中旱地施工。围堰基础为深厚透水性地层,若采用完全封闭的基坑渗控方案既不经济也不合理。结合渗流计算,从工程进度、安全性及造价等多方面综合比选,确定了4种透水地层基坑渗控方案,即管井降水,悬挂式垂直防渗墙,悬挂式垂直防渗墙+排水明沟,悬挂式垂直防渗墙+管井。分析比较结果表明,采用悬挂垂直防渗墙与降水管井相结合的防渗效果最好。
More
Translated text
Key words
deep permeable stratum,Phase I Works of Middle Route Project of S-N Water Diversion,suspended vertical seepage wall,well,cofferdam seepage control