The muon g-2 experiment at Brookhaven has successfully completed two exploratory runs using pion injection and direct muon injection for checkout and initial data taking. The main components of the experiment, which include the pion beam line, the superconducting storage ring and inflector magnets, the muon kicker and the lead-scintillating fiber calorimeters have been satisfactorily commissioned. First results on the anomalous magnetic moment of the positive muon from pion injection are good agreement with previos experimental results for aμ+ and aμ− from CERN and of comparable accuracy (13 ppm). Analysis of the 1998 muon injection run is in progress and expected to improve the precision to about 4 ppm. A first production run is scheduled for January 1999 with the goal of reaching the 1 ppm error level.