A study of the route planning and navigation flow condition of navigation-hydropower project at multi-branch river

Hydro-Science and Engineering(2012)

引用 23|浏览18
暂无评分
摘要
It is difficult to canalize project on multi-branch rivers.The project layout,route planning and navigation flow conditions and other aspects need comprehensive consideration.Taking the Anrenfu navigation-hydropower project of the Qujiang River in Zhejiang Province for example and based on the overall physical model,the route planning,channel regulation,operation scheduling and other key technical problems of the project at a multi-branch river is studied.Comparing the flow conditions for a number of routes in the upstream,this paper gives the best route and ship navigation safety conditions;According to the characteristic of the channel transition of the bank on downstream channel,the optimal layout scheme and regulation range of downstream channel is proposed.By means of reasonable operation and scheduling,the whole navigation problem is perfectly solved.
更多
查看译文
关键词
river dredging,operation and scheduling,navigation condition,route planning,entrance area,Anrenfu Navigation-power junction
AI 理解论文
溯源树
样例
生成溯源树,研究论文发展脉络
Chat Paper
正在生成论文摘要