Beam dynamics studies on BEPC-Ⅱ storage rings at the commissioning stage
CHINESE PHYSICS C(2009)
Abstract
During the 1st and 2nd stages of the commissioning of the upgrade project of the Beijing Electron Positron Collider (BEPC II), which started on Nov. 12, 2006 and Oct. 24, 2007, respectively, we got the luminosity one tenth of its design value, provided beams to synchrotron radiation users for about 4 months, and studied beam dynamics as well. In this paper, some beam dynamics studies on the storage rings and their preliminary results are given.
MoreTranslated text
Key words
BEPC II,commissioning,beam dynamics,luminosity