谷歌Chrome浏览器插件
订阅小程序
在清言上使用

Cycle-To-Cycle Extraction Synchronization Of The Fermilab Booster For Multiple Batch Injection To The Main Injector

2005 IEEE PARTICLE ACCELERATOR CONFERENCE (PAC), VOLS 1-4(2005)

引用 2|浏览2
暂无评分
摘要
We report on a system to ensure cycle-to-cycle synchronization of beam extraction from the Fermilab Booster accelerator to the Main Injector. Such synchronization is necessary for multiple batch operation of the Main Injector for the Run II upgrade of anti-proton production using slip-stacking in the Main Injector, and for the NuMI (Neutrinos at the Main Injector) neutrino beam. To perform this task a system of fast measurements and feedback controls the longitudinal progress of the Booster beam throughout its acceleration period by manipulation of the transverse position maintained by the LLRF (Low-level Radio Frequency) system.
更多
查看译文
关键词
production,neutrinos,feedback,acceleration,feedback control,accelerometers,particle accelerators
AI 理解论文
溯源树
样例
生成溯源树,研究论文发展脉络
Chat Paper
正在生成论文摘要