Installation and commisionning of the EU test facility for ITER gyrotrons

Fusion Engineering and Design(2007)

引用 8|浏览23
暂无评分
摘要
In the frame of the EU program on the ITER electron cyclotron wave (ECW) system, the development of a 170GHz, 2MW CW coaxial gyrotron with depressed collector (C-GT170) has been launched during the Sixth Framework Program (2003–2006) in the European Technology Workplan. Such development relies on the availability of a test facility (TF) capable of providing both the energy sources and sinks required by this new electron tube (electrical energy, cooling capacity), and allowing the control and acquisition of a large range of signals used to understand and improve the gyrotron behaviour. The TF will be used, in a later stage, for the component test of the ITER ECW system. This paper will report on the design, installation and commissioning of the TF in Lausanne.
更多
查看译文
关键词
Gyrotron,Test facility (TF),HV power supplies (HVPS),Superconducting magnet (SCM),Radio frequency conditioning unit (RFCU)
AI 理解论文
溯源树
样例
生成溯源树,研究论文发展脉络
Chat Paper
正在生成论文摘要