Abstract
In the paper,acceptance of 500 kV substation automation system background has been finished,and intelligent electronic devices and its secondary remote control execute circuit were considered to be correct.According to the remote control operating characteristics of the telecontrol protocol,control data can be checked without tripping or closing the devices.Consequently work efficiency can be improved by reducing checking workload and safety and reliability of remote control trials can be ensured.
More
Translated text
Key words
unattended substation reform,remote control trail,central control station