Performance of the first beam on Shenguang III technical Integration Line

JOURNAL DE PHYSIQUE IV(2006)

Cited 4|Views26
No score
Abstract
Technical Integration Line (TIL), which is being constructed at CAEP, is the prototype of Shenguang III fusion laser facility. Experimental results during the first integrated tests on the first line demonstrate that the laser system architecture from master oscillator through the laser amplifiers can meet the requirement of TIL engineering design. In this paper, brief introduction of TIL and main experiment results are presented.
More
Translated text
Key words
engineering design,system architecture,oscillations
AI Read Science
Must-Reading Tree
Example
Generate MRT to find the research sequence of this paper
Chat Paper
Summary is being generated by the instructions you defined