谷歌Chrome浏览器插件
订阅小程序
在清言上使用

Optimal Research and Numerical Simulation for Scheduling No-Wait Flow Shop in Steel Production.

JOURNAL OF APPLIED MATHEMATICS(2013)

引用 6|浏览9
暂无评分
摘要
This paper considers the m-machine flow shop scheduling problem with the no-wait constraint to minimize total completion time which is the typical model in steel production. First, the asymptotic optimality of the Shortest Processing Time (SPT) first rule is proven for this problem. To further evaluate the performance of the algorithm, a new lower bound with performance guarantee is designed. At the end of the paper, numerical simulations show the effectiveness of the proposed algorithm and lower bound.
更多
查看译文
关键词
numerical simulation,no-wait
AI 理解论文
溯源树
样例
生成溯源树,研究论文发展脉络
Chat Paper
正在生成论文摘要