全漏失钻孔预送冲洗液时间的确定
Exploration Engineering(Rock & Soil Drilling and Tunneling)(2011)
Abstract
在岩心钻探施工中,全漏钻孔的预送冲洗液时间问题往往困扰着机台施工人员,为此提出了预送冲洗液的两种计算方法。
MoreTranslated text
Key words
bit burning,supply time for advance flushing fluid,full circulation loss
AI Read Science
Must-Reading Tree
Example
Generate MRT to find the research sequence of this paper
Chat Paper
Summary is being generated by the instructions you defined