Transition Probability Matrix Methodology For Incremental Risk Charge
INTERNATIONAL JOURNAL OF FINANCIAL ENGINEERING(2014)
摘要
As part of Basel II's incremental risk charge (IRC) methodology, this paper summarizes our extensive investigations of constructing transition probability matrices (TPMs) for unsecuritized credit products in the trading book. The objective is to create monthly or quarterly TPMs with predefined sectors and ratings that are consistent with the bank's Basel PDs. Constructing a TPM is not a unique process. We highlight various aspects of three types of uncertainties embedded in different construction methods: (1) the available historical data and the bank's rating philosophy; (2) the merger of one-year Basel PD and the chosen Moody's TPMs; and (3) deriving a monthly or quarterly TPM when the generator matrix does not exist. Given the fact that TPMs and specifically their PDs are the most important parameters in IRC, it is our view that banks may need to make discretionary choices regarding their methodology, with uncertainties well understood and managed.
更多查看译文
关键词
Basel II, incremental risk charge, transition probability matrix, default probability, default correlation
AI 理解论文
溯源树
样例
![](https://originalfileserver.aminer.cn/sys/aminer/pubs/mrt_preview.jpeg)
生成溯源树,研究论文发展脉络
Chat Paper
正在生成论文摘要