STATUS OF THE SUPERSTRUCTURE

msra

引用 26|浏览30
暂无评分
摘要
Abstract The first prototype of the superstructure, seen as the alternative solution to the standard TTF cavity, will be tested with beam,in April 2002. Since the last SRF’99 Workshop, a new version, based on 9-cell sub-units has been proposed. In this report we present this version and status of components,we prepare for the beam,test.
更多
查看译文
AI 理解论文
溯源树
样例
生成溯源树,研究论文发展脉络
Chat Paper
正在生成论文摘要