Design of Parallel Implementations by Means of Abstract Dynamic Critical Path Based Profiling of Complex Sequential Algorithms.
International Workshop on Power and Timing Modeling, Optimization and Simulation(2006)
Key words
critical path,parallelization potential,parallel implementation solution,parallel implementations design,parallel solution,possible parallel implementation,design flow,developed methodology,system-level design,abstract level,abstract dynamic critical path,complex sequential algorithm
AI Read Science
Must-Reading Tree
Example

Generate MRT to find the research sequence of this paper
Chat Paper
Summary is being generated by the instructions you defined