Evaluation of IRAN Dispatching Status for Next 10 Years with Neural Network

Future Power and Energy Engineering(2010)

引用 0|浏览0
暂无评分
摘要
Dispatching centers play an important role in safe and stable operation and also have a great importance observing economical usages. Basically stepwise dispatching system is corresponding to electrical network structures and the ministry of power management methods, and also has to be more flexible with future operation methods and able to coordinate with future structure of country power network. In this paper, important hints and tips to improve dispatching situation, is presented besides clarifying the status of Iran power network with the current structure of AOC’s in next 10 years. Since the demand of each AOC is a nonlinear and multivariable function, Artificial Neural Network (ANN) is used for load consumption estimation. Finally total generation need in each AOC for satisfying one of the major indexes, generation and consumption balance, will present.
更多
查看译文
关键词
iran dispatching status,important role,future structure,important hint,current structure,electrical network structure,neural network,power management method,iran power network,future operation method,consumption balance,country power network,power systems,power generation,back propagation,indexes,indexation,production,artificial neural network,neural nets,satisfiability,electrical network,power plant,artificial neural networks
AI 理解论文
溯源树
样例
生成溯源树,研究论文发展脉络
Chat Paper
正在生成论文摘要