Fully distributed initialization procedure for a 2D-Mesh NoC, including off-line BIST and partial deactivation of faulty components

On-Line Testing Symposium(2010)

引用 4|浏览0
暂无评分
摘要
In this paper, we present an embedded, at speed, off-line, and fully distributed initialization procedure for 2D-Mesh Network-on-Chip (NoC). This procedure is executed at power boot, and targets the detection and the deactivation of the faulty routers and/or faulty communication channels. The final objective is fault tolerance. The proposed procedure is able to clean the NoC from all destructive malfunctions induced by permanent hardware failures. This initialization procedure has been implemented in a reconfigurable version of the DSPIN micro-network, and evaluated from the point of view of Stuck-at fault coverage, and area overhead.
更多
查看译文
关键词
faulty routers,off-line bist,faulty communication channels,faulty components,dspin micronetwork,fully distributed initialization procedure,initialization procedure,faulty component,fault tolerance,built-in self test,permanent hardware failures,faulty communication channel,partial deactivation,stuck-at fault coverage,proposed procedure,2d-mesh noc,area overhead,final objective,network-on-chip,dspin micro-network,destructive malfunction,fault tolerant,communication channels,chip,mesh network,multiplexing,network on chip,fault coverage
AI 理解论文
溯源树
样例
生成溯源树,研究论文发展脉络
Chat Paper
正在生成论文摘要